双组份打胶机使用流程介绍

时间:2023-04-12 来源:http://www.jncsjx.com/ 发布人:昌盛机械

1、接通气源:
1. Connect the air source:
电源接通,调节减压阀至0.4~0.6Mpa,检查系统有无漏气现象。然后试运行以下动作:(1)A泵提升;(2)A泵充气;(3)B泵提升;(4)B泵充气。注意:提升气缸提升时,如果两气缸不同步,请下降至原点后重新操作。
Connect the power supply, adjust the pressure reducing valve to 0.4~0.6Mpa, and check the system for air leakage. Then test run the following actions: (1) Lift pump A; (2) Pump A inflation; (3) Pump B lifting; (4) Pump B inflates. Attention: When lifting the cylinder, if the two cylinders are not synchronized, please lower to the original point and operate again.
2、将双组份打胶机的A、B组份胶桶就位,并与A、B胶泵的轴线对中。
2. Place the A and B component rubber drums of the dual component glue machine in position and align them with the axis of the A and B glue pumps.
以A组份为例:
Taking component A as an example:
1)操作双组份打胶机的手动转阀,将A泵提升至高,提升过程中观察各管路有无拉伸过紧处。
1) Operate the manual rotary valve of the dual component glue machine to raise pump A to its highest position. During the lifting process, observe whether each pipeline is stretched too tightly.
2)将胶桶放置在A泵压胶盘下,开启胶桶,将其中塑料袋外翻至桶外,胶面塑料片取出。
2) Place the rubber bucket under the pressure plate of pump A, open the rubber bucket, flip the plastic bag out of the bucket, and remove the plastic sheet on the rubber surface.
3)使A泵压盘缓慢下降,压盘入桶时应使其与桶口对准,将压胶盘排气口打开,直到压盘接触胶面。待压盘内气体全部排放完并有少量胶从排气口溢出时,即可关闭排气阀。(提升开关保持下压状态)
3) Slowly lower the pressure plate of pump A, align it with the barrel opening when entering the barrel, and open the exhaust port of the pressure plate until it contacts the adhesive surface. When all the gas in the pressure plate is discharged and a small amount of glue overflows from the exhaust port, the exhaust valve can be closed. (The lifting switch remains pressed down)
4)开机试打胶:将双组份打胶机的主泵气源开关打开,按下胶枪开关,直至A泵里空气排净枪口处出胶连续时停止。
4) Start up and test glue application: Turn on the air source switch of the main pump of the two-component glue application machine, press the glue gun switch, and stop until the air in pump A is completely discharged and the glue is continuously discharged from the gun mouth.
双组份打胶机
用同样的方法操作B泵。
Operate pump B in the same way.
4、打胶操作:
4. Gluing operation:
1)松开比例杠杆上的比例泵锁紧螺钉,将比例泵内外调整至所需比例。只有当A胶和B胶的配比达到正常值时,才可进行下面的操作。
1) Loosen the locking screw of the proportional pump on the proportional lever and adjust the inside and outside of the proportional pump to the desired ratio. The following operations can only be carried out when the ratio of adhesive A and adhesive B reaches the normal value.
2)置选择旋钮于A、B泵开,将胶枪出口对准两片玻璃的中缝,打开胶枪开关,以适当速度平稳地移动胶枪使玻璃槽内的双组份胶填满充实为佳。打胶结束时关闭胶枪。
2) Set the selection knob on pump A and pump B, align the glue gun outlet with the middle seam of the two pieces of glass, turn on the glue gun switch, and move the glue gun smoothly at an appropriate speed to fill and enrich the two component glue in the glass groove. Turn off the glue gun at the end of gluing.
5、更换胶桶:
5. Replacing the rubber bucket:
1)当双组份打胶机的胶桶内的胶用完时,应立即关闭A、B开关,停止打胶。
1) When the glue in the barrel of the two-component glue applicator is used up, the A and B switches should be immediately turned off to stop the glue application.
2)打开A(或B)胶泵充气开关,选择A(或B)胶泵提升机构为上升位置,点动旋钮使压盘慢慢提起,此时应注意:胶桶尽量不要离开底盘,直至压盘完全脱离胶桶时关闭A(或B)胶泵的充气开关。
2) Turn on the inflation switch of the A (or B) rubber pump, select the lifting mechanism of the A (or B) rubber pump as the rising position, and slowly lift the pressure plate by clicking the knob. At this time, it should be noted that the rubber barrel should not leave the chassis as much as possible until the pressure plate completely disengages from the rubber barrel, and turn off the inflation switch of the A (or B) rubber pump.
3)撤出空桶,将新胶桶置于工作位置,重复第3、4、项操作。
3) Withdraw the empty bucket, place the new rubber bucket in the working position, and repeat operations 3, 4, and 4.
1、胶枪:因双组份打胶机是由两种胶混合而成的,其凝固速度与环境温度和A、B胶的比例有关,混合后的胶一般在20分钟之内就会反应固化。所以,当设备在正常打胶后,20分钟之内不使用就必须将混合后的胶冲洗出来,以免堵塞混胶器和胶枪。
1. Glue gun: As a two-component glue applicator is made by mixing two types of glue, its solidification speed is related to the ambient temperature and the ratio of A and B glue. The mixed glue will generally react and solidify within 20 minutes. So, when the equipment is not in use within 20 minutes after normal glue application, the mixed glue must be washed out to avoid blocking the glue mixer and glue gun.
本文由双组份打胶机整理发布,您是不是对这些内容有所了解了呢?更多的内容请点击:http://www.jncsjx.com  我们会有更多精彩内容等你查看。
This article is organized and published by a two component adhesive machine. Have you gained some understanding of these contents? For more information, please click on: http://www.jncsjx.com We will have more exciting content waiting for you to check out.