双组份打胶机的注意事项

时间:2018-11-08 来源:http://www.jncsjx.com/ 发布人:昌盛机械

双组份打胶机的注意事项
Points for attention of two component glue machine
1.在当天机器操作完毕后要把胶管内的胶冲出,防止硬化;假如长期不实用要注意用火油清洗胶管和胶枪。
1. After the machine is finished, the glue in the hose should be washed out to prevent hardening. If it is not practical for a long time, attention should be paid to cleaning the hose and gun with gun oil.
2.双组份打胶机运用的硅酮胶或聚硫胶要注意杂质不能过高,低质量的胶简单阻塞胶管的过滤体系,形成出胶不畅或不均匀。
2. Silicone glue or polysulfide glue used in two-component glue beater should pay attention to impurities not too high, low-quality glue simply obstructs the filter system of rubber hose, forming a glue not smooth or uneven.
3.在替换胶的种类时要特别注意把双组份打胶机内残留的胶冲净,好清洗,由于不同种类乃的胶简单反响阻塞机器。
3. When replacing the types of glue, special attention should be paid to cleaning the residual glue in the two-component glue beater. It is best to clean the machine because of the simple reaction blocking of different types and brands of glue.
4.液压站体系的压力,不能调的太高,要根据室内环境温度等实际状况,调满意胶嘴正常出胶均匀打胶即可。打开液压站时一定要打开胶枪,不然B组份管路压力将升得很高,形成事故。
4. The pressure of the hydraulic station system can not be adjusted too high. According to the actual conditions such as indoor environment temperature, it is necessary to adjust the pressure to satisfy the normal tapping of the rubber nozzle and evenly tap the rubber. When opening the hydraulic station, the rubber gun must be opened, otherwise the pressure of component B pipeline will rise very high, resulting in a safety accident.
5.A胶提胶泵接连作业1分钟以上没有供胶中止,阐明管路内有空气,此刻会报警,须打开泵上管接头再打开A胶提胶泵,直到出胶中止,中止并接好接头,胶枪会出现有空气的哔哔爆炸声,空气排净就好了。
5.A rubber-lifting pump has not stopped running for more than one minute. It is stated that there is air in the pipeline. At this moment, it will alarm. It is necessary to open the upper pipe joint of the pump and then open the A rubber-lifting pump until the rubber-releasing stop and stop and connect the joint. There will be a beeping explosion of air in the rubber gun, and the air will be exhausted completely.
6.硅酮胶B 组份遇空气会结壳,影响泵的正常作业和管路的畅通,因此,停机时B组份胶的一切通道在泄压后均应封闭,使B组份不得触摸空气。
6. Silicone gel B component will crust when it meets the air, which will affect the normal operation of the pump and the smooth flow of the pipeline. Therefore, all channels of the B component gel should be closed after pressure relief so that the B component can not touch the air.
7.正常作业时不要断气源,假如发现断气源应中止作业。
7. do not cut off the gas source during normal operation. If the source of gas is found, the operation should be aborted.
8.双组份打胶机设备应装置在枯燥.无粉尘.无腐蚀性气体的坏境中(该要求与其他设备共同,当然假如条件达不到少争夺无腐蚀性气体,毕竟设备中有电线以及管路这些配件抗腐蚀性不高)。
8. Dual-component glue beater equipment should be installed in a dry, dust-free, non-corrosive gas environment (this requirement is common with other equipment, of course, if conditions do not reach at least to compete for non-corrosive gas, after all, there are electrical wires and pipelines in the equipment which have low corrosion resistance).

双组份打胶机
9.室内温度好控制在10~40度的室内坚固地上上,地上应水平度要好。(小编这儿说的地上水平度要好纷歧定要十分的平坦才行,咱们的设备在规划之初已经考虑到了地上复杂性的要素所以对地上平坦度是有相当大的忍让度的,只需不是起伏提其他大一般都能够正常作业。)
9. indoor temperature is best controlled in the indoor environment of 10~40 degrees above ground level. (Xiaobian here said that the above-ground level should be very flat, our equipment has taken into account the complexity of the above-ground elements at the beginning of the planning, so there is a considerable degree of tolerance for the above-ground level, as long as it is not ups and downs and other general can work normally.)
10.双组份打胶机装置之前,应先查看是否有因运送.搬动形成的变形.损坏和紧固件松动状况,之前就曾经有客户在移动打胶机的过程中把设备的智能控制体系的一个零部件碰掉了而导致设备无法正常运行,咱们的作业人员到现场后才排查出的原因。
10. Before installing a two-component gluing machine, we should check whether there is any deformation, damage and fastener loosening caused by transportation and removal. Before that, some customers knocked off one part of the intelligent control system of the equipment in the process of moving the gluing machine, which caused the equipment to fail to work properly. Our operators came to the scene. Only after investigation.
11.首要咱们能够根据地上平坦度的实际状况来经过调整设备的可升降地脚螺栓来调整设备的水平度直到设备水平而安定。然后按图接线并牢靠接地,把气源接入机器所配带的气源接口,保证无漏气现象。
11. First of all, we can adjust the elevating anchor bolts of the equipment according to the actual situation of the ground flatness to adjust the level of the equipment until the level of the equipment is stable. Then connect according to the graph and grounding firmly, and connect the air source to the air source interface of the machine, so as to ensure that there is no leakage.
12.向油槽中加注液压油指定方位,46#液压油(约为50升左右)。
12. fill the oil tank with hydraulic oil to the specified position, 46# hydraulic oil (about 50 litres).
综上所述有济南昌盛机械提供,想了解更多双组份打胶机知识,欢迎关注我们的网站:http://linshi.jncsjx.com谢谢支持!
To sum up Ji'nan Changsheng machinery to learn more, two-component glue machine, welcome to pay attention to our website: http://linshi.jncsjx.com thank you for your support!

联系我们Contact us

  • 咨询热线:0531-85717458 13705446998
  • 公司地址: 山东省德州市齐河安头乡企巢工业园
  • 扫码联系我们:

截屏,微信识别二维码

微信号:13705446998

//