高压柱塞泵是供胶机的动力来源
时间:2018-04-17 来源:http://www.jncsjx.com/ 发布人:昌盛机械
A组份提胶由电动齿轮泵提供,经管道输送至油压驱动的A胶高压柱塞泵增压。B组份提胶由气动往复泵提供,经管道输送至油压驱动的B组分高压柱塞泵增压。
The A component is extracted from the electric gear pump and transported to the A high pressure piston pump driven by oil pressure. The B component is provided by pneumatic reciprocating pump and transported to the B component high-pressure piston pump driven by oil pressure.
CL-B-01型双组份供胶机主要有A组份提胶泵、B组份提胶泵, A、B胶增压装置,高压柱塞泵,A、B胶泵连接装置,双组分比例调节机构,高压出口安全分流装置,液压控制系统,气动控制系统及电器控制系统等组成。
CL-B-01 type two component glue feeder mainly includes A component glue pump, B component extraction pump, A, B glue booster device, high pressure plunger pump, A, B glue pump connection device, double component proportional regulation mechanism, high pressure outlet safety shunt device, hydraulic control system, pneumatic control system and electrical control system.
供胶机的B组份胶出口处设有放泄阀,可以放气或泄压回流用,同位置还设置了超压回流的安全装置。在机头上进入混合器之前设有关断球阀和单向止回阀,防止A、B组份胶互串,造成固化而堵塞通道。
The outlet of the B component of the glue feeding machine is equipped with a drain valve, which can be used for outgassing or pressure relief, and a safety device for overpressure reflux is also installed at the same location. Before the mixer enters the mixer, a shut-off ball valve and a one-way check valve are provided to prevent A and B components from interlocking, resulting in solidification and blocking the passageway.
B胶的体积比例由双组分比例调节机构调整,然后,同时送入打胶机混合器,混合器由36节以上混合装置组成,双组份胶充分混合后到达涂胶枪,从胶嘴喷出,涂布于中空玻璃的边缘进行封边。胶嘴设有启动快速关闭阀,用以准确控制出胶时间。
The volume ratio of B glue is adjusted by the double component proportional regulating mechanism, and then sent to the mixer mixer. The mixer is composed of 36 sections and above, and the double component glue is fully mixed to the glue gun, and the glue nozzle is sprayed out and coated on the edge of the hollow glass. The glue nozzle is equipped with a start-up quick closing valve to control the time of dispensing accurately.
A、B组份体积比例调节由双组分比例调节机构完成。 A、B组份比例分配比的调节主要靠调节高压泵前端连轩上的滑块,向上调B胶出胶少,向下调B胶出胶多。滑块中心距上端轴中心线16.4cm时,A/B胶的比例为10比1。
The volume ratio of A and B is adjusted by two-component proportional regulation mechanism. The adjustment of proportion distribution ratio of A and B mainly depends on adjusting the slide on the front side of the high-pressure pump, increasing the B glue and decreasing the number of B glue. The proportion of A/B glue is 10 to 1 when the center of the slide is 16.4cm from the center line of the upper shaft.
柱塞泵油压调整装置设在油槽上端盖上面,可分别调整。
The oil pressure adjusting device of the plunger pump is arranged on the upper end cover of the oil groove, and can be adjusted separately.
本文由双组份打胶机友情奉献.更多有关的知识请点击:http://linshi.jncsjx.com我们将用的技术.真诚的态度.为您提供为全面的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.
This article is dedicated to the double component glue machine. More related knowledge, please click: http://linshi.jncsjx.com we will use the most advanced technology. The most sincere attitude. Provide you with the most comprehensive service. More related knowledge will be devoted to you. Please look forward to it.
- 中空玻璃全自动封胶线的优缺点是什么 2025/01/07
- 双组份打胶机出花胶怎样处理 2025/01/04
- 中空玻璃全自动封胶线一天能做多少平方 2024/12/28
- 中空玻璃生产线一天能做多少平方 2024/12/23
- 全自动丁基胶涂布机操作规程 2024/12/14
- 丁基胶涂布机在使用的常见问题 2024/12/13
- 双组份打胶机如何调整滴胶量? 2024/12/09
- 中空玻璃生产线的磨损如何解决 2024/12/07
- 双组份打胶机对于打胶工作完成很重要 2024/12/05
- 全自动封胶线的工业自动化设备介绍 2024/12/03