双组份打胶机的装置
Device of two-component glue beater
1、双组份打胶机设备应装置在枯燥、无粉尘、无腐蚀性气体的坏境中(该要求与其他设备分歧,当然假如条件达不到多争取无腐蚀性气体,毕竟设备中有电线以及管路这些配件抗腐蚀性不高)。
1. The equipment of two-component glue beater should be installed in the condition of dull, dust-free and non-corrosive gas. (This requirement differs from other equipment. Of course, if the condition can not reach the maximum, strive for non-corrosive gas, after all, the corrosion resistance of electrical wires and pipes in the equipment is not high.)
2、室内温度好控制在10~40度的室内坚固空中上,空中应程度度要好。(小编这里说的空中程度度要好不一定要十分的平整才行,我们的设备在设计之初曾经思索到了空中复杂性的要素所以对空中平整度是有相当大的忍让度的,只需不是幅度提别的大普通都可以正常任务。)
2. Indoor temperature should be controlled in a solid indoor air of 10-40 degrees, and the air should be better. (Xiaobian here said that the air level is better, not necessarily very flat, our equipment at the beginning of the design has considered the elements of air complexity, so there is a considerable degree of tolerance for air level, as long as it is not the range of other general can be normal tasks.)
3、双组份打胶机装置之前,应先反省能否有因运输、搬动形成的变形、损坏和紧固件松动状况,之前就已经有客户在挪动打胶机的进程中把设备的智能控制零碎的一个零部件碰掉了而招致设备无法正常运转,我们的任务人员到现场后才排查出的缘由。
3. Before installing a two-component glue beater, we should first reflect on whether there is deformation, damage and loosening of fasteners caused by transportation and moving. Before that, customers have already knocked off a fragmentary part of the intelligent control of the equipment in the process of moving the glue beater, which causes the equipment to fail to work properly. Our task personnel arrived at the airport. Reasons were found after the scene.
4、我们可以依据空中平整度的实践状况来经过调整设备的可升降地脚螺栓来调整设备的程度度直到设备程度而稳定。然后按图接线并牢靠接地,把气源接入机器所配带的气源接口,确保无漏气景象。
4. First of all, we can adjust the elevating anchor bolts of the equipment according to the practice of air smoothness until the equipment is stable. Then connect according to the graph and grounding firmly, and connect the air source to the air source interface of the machine, so as to ensure that there is no air leakage.
5、向油槽中加注液压油指定地位,46#液压油(约爲50升左右)。
5. Fill the tank with hydraulic oil to the designated position, 46# hydraulic oil (about 50 liters).
6、接通电源并翻开检查设备能否可以正常运转。
6. Turn on the power supply and check whether the equipment can work properly.

双组份打胶机

双组份打胶机的留意事项
Notes on Two-Component Glue Punching Machine
1、在当天机器操作终了后要把胶管内的胶冲出,避免硬化;假如长工夫不适用要留意用煤油清洗胶管和胶枪。
1. After the machine operation on that day, the glue in the hose should be washed out to avoid hardening; if long time is not suitable, pay attention to cleaning the hose and gun with kerosene.
2、双组份打胶机运用的硅酮胶或聚硫胶要留意杂质不能过高,低质量的胶容易梗塞胶管的过滤零碎,形成出胶不畅或不平均。
2. Silicone glue or polysulfide glue used in two-component glue beater should pay attention to the impurities should not be too high, low-quality glue is easy to obstruct the filter fragments of rubber hose, resulting in poor or uneven glue production.
3、在改换胶的种类时要特别留意把双组份打胶机内残留的胶冲净,好清洗,由于不同种类甚的胶容易反响梗塞机器。
3. When changing the type of glue, special attention should be paid to rinsing the residual glue in the two-component glue beater, and it is best to clean it, because different types or even brands of glue are easy to react to the obstruction machine.
4、液压站零碎的压力,不能调的太高,要依据室内环境温度等实践状况,调满足胶嘴正常出胶平均打胶即可。翻开液压站时一定要翻开胶枪,否则B组份管路压力将升得很高,形成平安事故。
4. The piecemeal pressure of the hydraulic station can not be adjusted too high. According to the indoor environment temperature and other practical conditions, it can be adjusted to meet the normal tapping average of the rubber nozzle. When turning over the hydraulic station, the rubber gun must be turned over. Otherwise, the pressure of component B pipeline will rise very high, resulting in a safety accident.
5、A胶提胶泵延续任务1分钟以上没有供胶中止,阐明管路内有空气,此时会报警,须翻开泵上管接头再翻开A胶提胶泵,直到出胶爲止,中止并接好接头,胶枪会呈现有空气的哔哔爆破声,空气排净就好了。
5. A rubber-lifting pump lasts for more than 1 minute without ceasing rubber supply. It clarifies that there is air in the pipeline. At this time, the alarm will be given. It is necessary to turn on the upper pipe joint of the pump and turn on the A rubber-lifting pump until the rubber is released, stop and connect the joint, the rubber gun will appear the beeping explosion sound of air, and the air will be discharged clean.
6、硅酮胶B 组份遇空气会结壳,影响泵的正常任务和管路的疏通,因而,停机时B组份胶的一切通道在泄压后均应封闭,使B组份不得接触空气。
6. Component B of silicone gel will crust when it meets the air, which will affect the normal task of the pump and the dredging of the pipeline. Therefore, all passages of component B of silicone gel should be closed after pressure relief, so that component B can not touch the air.
7、正常任务时不要断气源,假如发现断气源应中止任务。
7. Do not stop the gas source during normal tasks. If the gas source is found, the task should be terminated.
综上所述有济南昌盛机械提供,想了解更多双组份打胶机知识,欢迎关注我们的网站:http://linshi.jncsjx.com谢谢支持!
In summary, all the above-mentioned Jinan Changsheng Machinery provides, want to know more about the two-component glue machine knowledge, welcome to pay attention to our website: http://linshi.jncsjx.com Thank you for your support!

联系我们Contact us

  • 咨询热线:0531-85717458 13705446998
  • 公司地址: 山东省德州市齐河安头乡企巢工业园
  • 扫码联系我们:

截屏,微信识别二维码

微信号:13705446998

//