丁基胶涂布机出现问题怎么维修?

时间:2021-08-23 来源:http://www.jncsjx.com/ 发布人:昌盛机械

一、丁基胶涂布机出胶正常,但涂不到铝框上
1、 The butyl adhesive coater is normal, but it cannot be applied to the aluminum frame
(1) 胶头间隔过大,应调近间隔为0.5-0.6mm,如8.0铝框应调8.5-8.6。
(1) If the rubber head spacing is too large, it shall be adjusted closer to 0.5-0.6mm. For example, 8.5-8.6 shall be adjusted for 8.0 aluminum frame.
(2)胶的熔点过高,提高胶头胶缸的温度。
(2) If the melting point of the rubber is too high, increase the temperature of the rubber head and rubber cylinder.
二、丁基胶涂布机出胶量小
2、 Butyl rubber coater has small glue output
(1)查看系统的挤胶压力正常为8-16mPa。
(1) Check that the extrusion pressure of the system is normally 8-16mpa.
(2) 胶头被杂物阻塞,需整理胶头。用火油清洗作用更佳。
(2) The rubber head is blocked by sundries and needs to be cleaned. It is better to clean with fire oil.


(3)丁基胶涂布机胶头不出胶
(3) The rubber head of butyl rubber coater does not release glue
(4)查看温度是否已达到设定温度。
(4) Check whether the temperature has reached the set temperature.
(5)查看系统是否有压力。
(5) Check the system for pressure.
气源压力0.4-0.6之间
The air supply pressure is between 0.4-0.6
挤胶压力8-16之间
Extrusion pressure between 8-16
温度:依据胶的实际情况110-160之间,一般120℃
Temperature: according to the actual situation of glue, it is between 110-160, generally 120 ℃
现用胶:胶缸为125℃ 胶头为125℃
Current rubber: 125 ℃ for rubber cylinder and 125 ℃ for rubber head
丁基胶涂布机铝框前段打不上胶:调整涂胶阀时刻,落下时刻减小。
The front section of aluminum frame of butyl adhesive coater cannot be glued: adjust the gluing valve time and reduce the falling time.
铝框后端打不上胶:调整涂胶阀时刻,抬起时刻加长。
The rear end of the aluminum frame cannot be glued: adjust the gluing valve time and lengthen the lifting time.
SET选择 ENT承认 ? ?移位
Set select ent to acknowledge? displacement
丁基胶涂布机气液增压站的保护及修理
Protection and repair of gas-liquid booster station of butyl rubber coater
1、丁基胶涂布机系统翻开后,油缸无动作
1. After the butyl adhesive coater system is opened, the oil cylinder does not act
(1)查看外接气源是否正常。
(1) Check whether the external air source is normal.
(2)查看翻开液压电机开关后,系统电磁阀是否正常换向。
(2) Check whether the system solenoid valve reverses normally after opening the hydraulic motor switch.
(3)减压阀是否已翻开。
(3) Whether the pressure reducing valve has been opened.
(4)查看气液增压站上的气管是否有气压。
(4) Check whether there is air pressure in the air pipe on the gas-liquid booster station.
(5)如都正常,用平口螺丝刀按一下增压缸两头的小换向阀上的铜触头。
(5) If it is normal, press the copper contacts on the small directional valve at both ends of the booster cylinder with a flat screwdriver.
2、 丁基胶涂布机系统只进不退
2. Butyl rubber coater system is only in and out
(1)胶缸操作退翻开时,看液压换向阀上的灯是否亮。
(1) When the rubber cylinder is retracted and opened, check whether the light on the hydraulic directional valve is on.
(2)重复翻开关阀胶缸操作退开关,看是否能处理。
(2) Repeat turning the on-off valve rubber cylinder to operate the return switch to see if it can be handled.
(3)用铁片挡在液压换向阀的线圈端,灯亮时看是否有磁性,如无,需替换液压换向阀的伐圈,如有,需将换向阀拆下清洗。
(3) Block the coil end of the hydraulic directional valve with an iron sheet. When the light is on, check whether it is magnetic. If not, replace the cutting ring of the hydraulic directional valve. If so, remove the directional valve for cleaning.
(4)液压换向阀被杂物卡住,需拆下清洗。
(4) The hydraulic directional valve is stuck by sundries and needs to be removed for cleaning.
本文由双组份打胶机http://linshi.jncsjx.com奉献.更多有关的知识请点击:真诚的态度.为您提供为全面的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.
This paper is composed of two-component gluing machine http://linshi.jncsjx.com Dedication. For more relevant knowledge, please click: sincere attitude. Provide you with comprehensive service. More relevant knowledge will be offered to you one after another. Please look forward to it

联系我们Contact us

  • 咨询热线:0531-85717458 13705446998
  • 公司地址: 山东省德州市齐河安头乡企巢工业园
  • 扫码联系我们:

截屏,微信识别二维码

微信号:13705446998

//