丁基胶涂胶机的操作要注意什么?

时间:2023-07-07 来源:http://www.jncsjx.com/ 发布人:昌盛机械

1. 准备工作:将需要涂布的铝隔条准备好,检查涂布机的各项参数是否正常。
1. Preparation: prepare the aluminum spacer strip to be coated, and check whether the parameters of the coating machine are normal.
2. 调整设备:根据需要调整涂布机的涂布速度、压力和温度等参数,确保涂布质量符合要求。
2. Adjusting equipment: Adjust the coating speed, pressure, and temperature parameters of the coating machine as needed to ensure that the coating quality meets the requirements.
3. 丁基胶涂布机在常温下呈固体形态,须经过110-150℃得高温才能融化使用,因丁基胶导热较慢须加热20-30分钟(视气温而定)才能完全融化,所以要求每次使用该机之前要加热胶缸、胶头(110-150℃下保温)待胶融化后才能进行工作 。

立式丁基胶涂布机
3. The butyl adhesive coating machine is in a solid form at room temperature and must undergo a high temperature of 110-150 ℃ before melting. Due to the slow thermal conductivity of the butyl adhesive, it needs to be heated for 20-30 minutes (depending on the temperature) to fully melt. Therefore, it is required to heat the rubber cylinder and head (insulated at 110-150 ℃) before each use of the machine before starting work.
4. 监控涂布质量:丁基胶绝对不能出现断胶,铝条露白,这是影响中空玻璃寿命的关健。确保涂布的均匀性和厚度符合要求。
4. Monitoring the coating quality: The butyl adhesive must not break or the aluminum strip is exposed, which is a key factor affecting the lifespan of the insulating glass. Ensure that the uniformity and thickness of the coating meet the requirements.
5. 完成涂布:涂布完成后,关闭涂布机的开关,清理涂布机的残留物和废料,保持涂布机的清洁。
5. Complete coating: After the coating is completed, turn off the switch of the coating machine, clean the residue and waste of the coating machine, and maintain the cleanliness of the coating machine.

联系我们Contact us

  • 咨询热线:0531-85717458 13705446998
  • 公司地址: 山东省德州市齐河安头乡企巢工业园
  • 扫码联系我们:

截屏,微信识别二维码

微信号:13705446998

//